pre-production
Pre-production

INSTALLATION

Supervision of the operations of unpacking, positioning, mounting, connection to utilities, assembly and machine preparation;
Confirmation of installation with the "Installation Acceptance Report" certificate.

START UP

Start up of the machine and verification of mechanical and electrical functioning;
Testing of general functioning with cartons;
Ratification of standardisation procedures through the "Functioning Acceptance Report".

COMMISSIONING

Validation of the operation and utility of the machine;
Filling tests with the product and verification of the quality of container packaging;
Issuing of the "Commissioning Acceptance Report" as a guarantee of machine and packaging quality.